Project Description

Optimized drainage of under-saturated gas-condensate assets

Download Liquid Yield Optimization / Choke Control Brochure (PDF)
Pipe-It Shale Choke Control services rely on an improved description of the reservoir fl uids to yield a detailed wellhead pressure control schedule that optimizes Net Present Value. In under-saturated wells, maximum drawdown does not necessarily maximize revenue.